Build the OFM Minimal 2 wall-hung cabinet with Pure Box drawers, sheet by sheet
This wall cabinet is built from eight boards, joined by small metal cams and pins, then hung on two wall plates. You need a flat screwdriver, a cross-head screwdriver and a rubber mallet. Tap any part to see its name and number.
Each drawer carries up to 10 kg, and the whole cabinet up to 40 kg.
Screw seven cam pins (10) into each side panel and tap in four wooden dowels (9). The pins are the hooks of the joint: their round heads will be grabbed by cams later.
Press the round cams (8) into the large holes in the rails and the middle shelf, with the arrow on each cam pointing towards the board end.
A cam is a small metal drum. Turning it pulls the pin head in and locks the joint tight.
Lay side panel 1 flat and stand the top rails 7 and 6, the middle shelf 3 and the bottom rail 3 on its pins and dowels. Turn each cam a half turn clockwise with the flat screwdriver.
Lower side panel 2 onto the other ends of the rails and lock its cams the same way. You now have an open frame with no top or bottom.
Screw ten cam pins into the underside of top board 4 and tap in six dowels. Fit six pins and four dowels into bottom board 5.
On sheet 3 the numbers by board 5 are handwritten as 2 and 3; they mean pins (10) and dowels (9).
Turn the frame onto its back, front facing up. Press sixteen more cams into the holes near the top and bottom edges of the sides and rails.
Push top board 4 and bottom board 5 onto the frame so their pins drop into the edges, then lock every cam. The box is now closed and stiff.
Press a round sticker (11) over each of the 30 cams. They hide the metal and match the board colour.
Option 1, push-to-open: place the left runners (13) and right runners (14) on the inside of the sides, 43 mm back from the front edge.
Option 2, handles (sheet 6): fit plain runners the same way, skip sheet 5 and add the handles (22).
Fix each runner with two screws (12), eight in all, through the holes in its steel plate. A cross-head screwdriver drives them in.
Join two push-ends (20) to each tube (21) and press the ends onto the round knobs of the left and right push units. Now a push anywhere on the front opens the drawer evenly.
Place hanger 18 inside the right side and hanger 15 inside the left side, at the top rear corner just under the rear rail.
Fix each hanger with two screws (12). These two small brackets will carry the whole cabinet.
Slide cap 19 onto the right hanger and cap 16 onto the left one. They cover the hanger tabs neatly.
Fix the two wall plates (17) to the wall, then lift the cabinet and hook its hangers over them. For a 600 mm cabinet the inner screw holes are 468 mm apart.
Wall plugs are not in the box: choose plugs that suit your wall.
Rest each drawer on its pair of runners and push it in until it clicks. Push a front to open it; the Pure Box drawer sides are slim steel, so the drawer holds more inside.