# SAKTI Building Defect Walkthrough

How a planning tool maps 221 building defects to their rooms, orders the repairs by trade and tests the schedule against rain and delays before work begins\.

By aqilirwan

Topic: Engineering

[Open the interactive Jig](https://ask.jig.com/j/gzVgZjpoKMeW)

## Transcript

### 1. Meet SAKTI

Welcome to a little town with a new apartment tower, a busy office and a building crew\. SAKTI is a planning tool that helps teams find building defects, which are things built wrong or broken, and plan the fixes\. Every result you see here is an illustrative simulation\.

### 2. 221 defects, mapped

Handover is the day new homes pass to their owners\. The inspection report lists 221 defects, from cracked paint to loose tiles and leaky windows\. SAKTI pins each one to its exact room and floor, so the team sees where the work is, not just a long list\.

### 3. A repair plan for Day 27

SAKTI groups the repairs by trade and puts them in order, so painters, tilers and plumbers do not get in each other's way\. Each coloured block is a day of work\. The plan aims to finish on Day 27\.

### 4. Simulate the surprises

Before anyone picks up a tool, SAKTI tests the plan against real life\. Rain stops outdoor work, a contractor is short of people and the tile delivery is late\. Together they push completion to Day 32\.

### 5. A revised plan: Day 28

SAKTI reshuffles the work\. Indoor jobs move to the rainy days, the crew is rebalanced and the tiles are reordered\. The revised plan finishes on Day 28\.

### 6. Verify every repair

Each fixed defect is checked against its pin\. Red pins turn green one by one until all 221 items are verified\.

### 7. A leak in a working office

Next door, an office has a brown stain on its ceiling\. Water often runs along the roof layers before it drips, so the real leak can be a few metres away from the stain\.

### 8. Map it and plan around the day

SAKTI maps the wet area on the flat roof\. The plan keeps noisy roof work outside office hours, waits for a dry window and brings the crew and the delivery truck on the same day\.

### 9. Compare repair options

Patch the leak, recoat the whole roof or replace it? SAKTI simulates the time each option takes, so the owner can choose before work begins\. In this illustrative case, a recoat wins\.

### 10. Verify the roof

The crew rolls on the new coating and the team checks that the roof stays dry\. The stain is gone and the office stayed open the whole time\.

### 11. Plan it\. Simulate it\. Fix it on time\.

Plan it\. Simulate it\. Fix it on time\. Book Demo or Join Pilot at www\.mysakti\.asia\.

All simulation results shown are illustrative\.