Station-by-station assembly of the AgiBot X1 left arm from its SOP, on the production CAD
This guide follows the X1 assembly SOP for the left arm, station by station, on the production CAD. Seven actuated axes carry the gripper: two PFR86-2 joints at the shoulder, three PFR52-2 joints for upper-arm rotation, elbow and forearm, and two L28 push rods that tilt the wrist. Drag the wrist to pose the arm.
Every station uses a torque screwdriver set to 0.8 N·m: tighten until it clicks, working across each bolt circle in a star pattern.
Set the joint ID, then build the output stack: press the inner ring onto the joint, slide the KAA15XL0 four-point contact bearing and its spacer ring onto the inner ring, and fit the outer ring over the bearing. Drive the M3×14 countersunk screws in a star pattern and press two Ø4 dowel pins into opposite holes of the inner ring.
The SOP sheet lists five M3×14 screws; the CAD has eight, matching the robot BOM total of 144 (nine PFR86-2 × 8 plus six PFR52-2 × 12).
Set the joint ID. Fit the output retainer and the fixed retainer to the joint, seat the GLRAU3005 crossed-roller bearing on the output retainer and close it with the fixed flange. Drive twelve M3×14 countersunk screws in a star pattern, then press the Ø4×8 dowel pins into the fixed flange.
RAU3005: a 30 × 41 × 5 mm crossed-roller bearing. Each arm uses three of these joints, CAN IDs 3, 4 and 5.
Press Ø4×8 and Ø5×8 dowel pins into both halves of the Joint01 fixed flange and a Ø5×10 pin into the joint output. Clamp the halves around the first PFR86-2 joint with four M4×14 cap screws, then seat the ring-shaped Joint02 fixed flange on the output with eight M3×25 cap screws in a star pattern.
Check that the limit rib sits in its slot. The SOP text names flange 1 for the M3×25 fit; its drawing, parts list and the CAD show the Joint02 flange.
Press a Ø5×10 pin into the second PFR86-2 joint and Ø4×8 pins into Joint03 flange 1 and the Joint02 flange. Seat the joint in the Joint02 flange with sixteen M3×6 screws and mount Joint03 flange 1 on its output with eight M3×20 screws, both in a star pattern. Connect the 400 mm XT30(2+2) harness from joint 1 to joint 2.
The SOP text says this joint mounts on Joint01 flange 1; its drawing and the CAD place it in the Joint02 flange.
Offer the first PFR52-2 joint up into Joint03 flange 1, close Joint03 flange 2 behind it and drive four M4×14 cap screws in a cross pattern. Connect the 400 mm XT30(2+2) harness from joint 2 to joint 3.
Confirm the limit rib is seated in its limit slot before torquing.
Press four Ø4×8 pins into Joint04 flange 1 and bolt it to the joint 3 output with six M4×12 cap screws. Clamp the second PFR52-2 joint between Joint04 flanges 1 and 2 with four M4×14 screws, then connect the 300 mm XT30(2+2) harness from joint 3 to joint 4.
The six M4×12 screws on the joint 3 output are not modelled in the CAD. Check the limit rib is in its slot.
Bolt Joint05 output flange 1 to the third PFR52-2 joint with six M4×12 screws and clamp the joint between Joint05 fixed flange 1 and a second Joint03 flange 2 with four M4×14 screws. Fix the bracket to the elbow output with six M4×16 screws and connect the 400 mm harness from joint 4 to joint 5.
Per the harness table this cable runs exposed and is threaded through joints 4 and 5 before the brackets close. The SOP text repeats the output flange for the M4×16 fit; the CAD shows the bracket on the elbow.
Press two Ø4×8 pins into Joint05 output flange 1. On the bench, fit the wrist cross shaft into the hand link bracket on two SB685ZZ bearings and retain them with M3 flat-head screws, then do the same on the wrist main bracket. The cross shaft lets the hand tilt about two axes.
SB685ZZ: a shielded ball bearing, 5 × 11 × 5 mm in the CAD. The SOP text calls the pinned part output flange 2; the CAD has only output flange 1.
Set each push rod ID and fit a QR-SS-GE 4-1 rod end at the top and a POS 3 EC rod end at the bottom of each L28 push rod. Link the rods with the 100 mm GH1.25 harness, pin their tops to the wrist main bracket with GMSB5-10 shoulder screws and their bottoms to the hand link bracket with Ø3 M2.5 shoulder screws.
Driving both rods together tilts the hand about the cross shaft’s front-to-back axis; driving them in opposition tilts it about the side-to-side axis.
Mount the wrist main bracket on Joint05 output flange 1 with three M4×12 countersunk screws and fix the 24 V DC-DC step-down module base to it. Connect the 350 mm XT30(2+2)-L28 harness from joint 5 to the push rods and the L28-OmniPicker harness towards the gripper.
The OmniPicker gripper, its X1Hand adapter brackets and the DC-DC module are not in this CAD. The station BOM gives 350 and 300 mm for these harnesses; the harness table lists 250 and 200 mm.
Close the arm in its shells from the shoulder down: the Joint01 middle, front and rear shells, then the Joint02 to Joint04 shells, then the Joint05 and Joint06 shells over the forearm and wrist. Before each shell closes, check that the harness still has room to move.
From the full SOP’s left-arm shell stations 01–03. Their M3×4, M3×6 and M3×8 self-tapping screws are not in the CAD.
With the arm complete, check that every joint turns smoothly, each harness keeps slack across its joint, and every joint ID matches its position: CAN 1–2 shoulder, 3–5 upper arm, elbow and forearm, 6–7 push rods, 8 gripper. Drag the wrist to pose the arm: the joints follow and the push rods hold the hand’s direction.